Macdonalds Hotels

Kerr Office Group Macdonalds Hotel Windsor
  • Location

    Windsor

  • Value

    £175,000

  • Start Date

    JUNE 2010

  • Completion Date

    AUGUST 2010

Scope of Works

Design, develop and transform shop front/window into Hotel Entrance and lobby leading into Hotel, including complete fit out of reception lobby- ceramic floor, panelled feature walls (also designed in house), ceiling and lighting.

Challenges Resolved

Planning and programming the removal of the existing structural concrete stairwell from the rear of the lobby area and columns from the front, designing the new load bearing structures, Hotel frontage and the installation package. Consulting with the Royal Windsor Heritage team.

Gallery